Photo report of the construction of residential complex on the Olesya Gonchara street from 12.02.2021
Residential Complex Construction Report on the Olesya Gonchara street from 12.02.2021.
12.02.2021

As of 02/12/21, despite the difficult weather conditions, the general construction contractor, ChSMP Stroitel-P, is in full swing performing zero cycle works: foundations, walls, columns and ceilings below the +0,000 mark.
The work on the pile field has been completed. Excavation work has been completed to the extent that the technology of construction production allows.
A tower crane was installed and surveyed, a temporary power supply line for machines and mechanisms with a capacity of 300 kW was laid.